Construction of Infrastructure for the Main Oil Terminal (MOT) – Abu Dhabi Crude Oil Pipeline Project (ADCOP) United Arab Emirates
MOT PROJECT
MOT PROJECT
Project Scope
Construction of Tank Foundations (08 Nos.), Dykes, Ramps and Joining Road, Area Development, Fire Water Tanks (02 Nos.) etc.
Construction Challenges
- Cutting of mountain by controlled blasting and jack hammer for collection of Material (0-300mm)
- Construction of Tanks Foundations in layer (11 Layers)
Result
Achieved the required quality targets and met the timeline to support the completion of the entire scope of the Main Oil Terminal by the Client / Main Contractor CPECC